The scope of what counts as part of a claim is also spelled out. Recoverable soft costs, including architectural and engineering fees, project management oversight, specialized permit fees, and the cost of temporary relocation or bypass measures required to maintain state services during the repair period, must all be included. If the repair of state property triggers a mandatory upgrade to meet current building, safety, or environmental codes, those costs must be documented and included as a mandatory component of the claim.